Minutes of Tracker Meetings
February 10, 2005 Teledyne trip report
January 27, 2005 Teledyne trip report
January 24, 2005 Site visit, Parlex SJ (pitch adapters)
January 13, 2005 LVDS system testing
January 6, 2005 Meeting on PA trace cracking
January 5, 2005 Trip report, Teledyne
December 29, 2004 Trip report, Teledyne
December 15, 2004 EMI tape application
December 13, 2004 Tower A receiving, with I&T
December 9, 2004 Felix meeting
December 3, 2004 Felix meeting
December 3, 2004 MCM encapsulation MRB
November 16, 2004 Encapsulation MRB
November 12, 2004 Felix meeting
November 3, 2004 MCM conformal coating MRB
October 29, 2004 Felix meeting
October 26, 2004 Alignment Meeting
October 1, 2004 QA & Production Meeting at Teledyne
September 30, 2004 Meeting on MCM leakage current issue
September 8, 2004 Meeting at Plyform
September 2, 2004 Issue discussion with Jim Lohr
September 1, 2004 Meeting at GSFC with Parlex. Photos
August 27, 2004 Meeting at Parlex
July 21, 2004 TRR for Tower-A bottom tray static test
May 17, 2004 TRR for Tray thermal-vacuum testing at Roma-II
May 6, 2004 Meeting at Centrotecnica regarding tray vibration testing
April 30, 2004 Action items from this week's meetings in Pisa
April 23, 2004 Static test preparations meeting in Pisa
April 14, 2004, Static test preparations. Presentation by John Ku: (pdf)
April 7, 2004 Static test preparations
April 5, 2004 MRB on insert alloy
April 2, 2004 Meeting at Plyform
March 31, 2004 TKR EGSE development meeting
March 26, 2004 Alignment discussion
March 24, 2004 Discussion of Tracker/Grid alignment concept
March 23, 2004 Thermal Vacuum Test Closeout Meeting in Bari
March 9, 2004, Flex-circuit cable meeting
February 26, 2004, Thermal/Vacuum TRR and Weekly Meeting
February 24, 2004, meeting to plan the closeout of the Hytec contract.
February 12, 2004 Draft specs for prepreg order from COI (pdf)
February 10, 2004 Mechanical Meeting in Pisa
February 4, 2004 Mechanical meeting at SLAC
February 4, 2004 Meeting with Flight Software
January 29, 2004. T/V meeting in Pisa
January 29, 2004. Discussion of plans for an I&T tower mockup.
January 27, 2004. PRR at Plyform. T. Venator Notes. N. Menon minutes.
January 20, 2004. Tracker/Grid IDD meeting. Martin's tolerances (pdf). Sandro's note (pdf)
January 14, 2004. Tracker/Grid IDD meeting.
Tom Venator's notes from the Tracker meetings in Italy, Week of January 12, 2004
January 9, 2004. Engineering meeting on the flexure-grid interface
January 6, 2004. Engineering meeting on the flexure-grid interface
January 6, 2004. SOW meeting with Teledyne
December 4, 2003. Tracker Meeting. Flexure-Grid Interface Meeting
December 3, 2003. Engineering meeting on the flexure-grid interface
December 1, 2003. Special meeting on EM vibration testing.
November 6, 2003. T/V test plan slides from Jeff and Jack (pdf)
October 30, 2003. T/V fixture drawings (jpg1, jpg2). Cable fixation drawing (pdf)
September 26, 2003 (meeting on GTRC issues)
August 14, 2003 (composites telecon)
August 7, 2003 (meeting with GSFC on Tracker mechanical issues) Erik's matrix (pdf) Erik's letter.
May 28, 2003 (Actions from telecon with GSFC on Tracker test planning)
April 7, 2003 (meeting with Teledyne Electronic Technologies)
February 11, 2003 (meeting at Teledyne Electronic Technologies)
November 27, 2002 Photo of an encapsulated ladder. (jpeg)
November 4, 2002 (meeting at Teledyne Electronic Technologies)
August 15, 2002 (meeting at Teledyne Electronic Technologies)
August 1, 2002 Plots and histograms on ladder assembly. (pdf)
April 24, 2002 Tentative schedule modifications. (pdf)
Owner: Robert Johnson
Last Modified: 08/06/2005 01:51 PM